Supporting collaboration between the Department of Energy and Commonwealth Edison, Orion provided construction oversite for a substation expansion included in Argonne National Laboratory’s Electrical Capacity & Distribution Capability project. An onsite engineering team represented the owner, inspecting and testing all material and placement to ensure that the expanded substation met the standards of the designer, Exelon Utilities, and the National Laboratory.